Process

Five clear, connected stages, from understanding requirements to handing over the system with a complete documentation package.

Process

Five stages from requirements to handover

Our Approach

Engineering & Planning → Execution → Documentation

From understanding project requirements and developing engineering solutions, through execution in accordance with technical specifications and cGMP requirements, to documenting the work and preparing a comprehensive project handover dossier.

  1. 01
    Stage 01

    Requirements study & site survey

    Understanding the facility’s requirements and scope, and surveying the site and execution conditions.

  2. 02
    Stage 02

    Engineering, design & planning

    Drawings and routing, material and finish selection, and the execution, inspection and documentation plan.

  3. 03
    Stage 03

    Fabrication, preparation & execution

    Tube and assembly preparation, Orbital welding, fabrication and on-site installation.

  4. 04
    Stage 04

    Inspection, verification & testing

    Internal camera inspection where required, penetrant testing, pressure and leak tests, and passivation where applicable, within the scope agreed with the client.

  5. 05
    Stage 05

    Documentation & handover

    System handover with the agreed documentation package: weld and inspection records and project documents.

The scope of each stage depends on the nature of the project and the agreement with the client.

Have a project? Let’s discuss its requirements.

Send us your project details and requirements, and our team will get in touch to discuss the scope.